North-South Road Corridor, Tranche 4

ESIA for two mountain sections of Armenia's North-South Road Corridor: about 60 km from Sisian to Kajaran, and the Kajaran-Agarak section with its tunnel and access roads.

The assignment

For the Kajaran-Agarak section (10/2020 to 02/2022), the design work covered about 32 km from Agarak to the tunnel exit, about 7 km from the tunnel entrance to Kajaran and about 6 km of tunnel and access roads. We prepared the draft and final ESIA and ESMP.

For the Sisian-Kajaran section (03/2023 to 11/2023), we prepared the ESIA under the requirements of Armenian legislation and supported the project through state environmental expertise.

What we did

  • ESIA for the Kajaran-Agarak and Sisian-Kajaran sections
  • Draft and final ESIA and ESMP for Kajaran-Agarak
  • Coordination of the environmental and archaeological survey team
  • Public consultations and meetings with state bodies
  • Support and follow-up through state environmental expertise